File #: 19-0247    Version: 1 Name:
Type: Action Item Status: Consent Agenda
File created: 5/7/2019 In control: Board of County Commissioners
On agenda: 5/13/2019 Final action:
Title: Contract Amendment to Resurface the Javelin Runway at Durham County Memorial Stadium
Attachments: 1. Supplemental Document, 2. Quote Durham County Javelin V3, 3. Contract Amendment Beynon, Javelin Runway Surface, 4. MWBE Compliance Review Form-AAF for RFP 19-019 Amendment 050819
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Item:
Title
Contract Amendment to Resurface the Javelin Runway at Durham County Memorial Stadium

Body
Date of BOCC Meeting: May 13, 2019

Request for Board Action:
Agenda Text
The Board is requested to authorize the County Manager to execute a service contract amendment with Beynon Sports Surfaces Inc. in the amount of $48,039.00 to increase the existing service contract for the Track Resurfacing at Durham County Memorial Stadium (RFP 19-019). If approved, the revised contract total for track resurfacing will increase to a total amount of $417,039.00.

During preliminary power washing of the track surfaces as part of the track resurfacing project, Beynon Sport Surfaces performed a courtesy inspection of the javelin runway while they were onsite for the track resurfacing project. Upon inspection of the runway, defects were found in the surface which consisted of areas that were "bubbling" and not properly adhering to the concrete base layer. This is perceived to be caused by moisture permeating through the surface between the concrete and polyurethane layers of the javelin runway. The correction process includes the removal/disposal of the existing surface, treatment of the concrete including the installation of a moisture mitigation system, installation of 13mm of Encapsulated Track Surfacing (same as the stadium track) and striping of the runway. A performance bond (.5%) is also included in the cost to resolve any workmanship/project delivery issues. To ensure a safe and properly functioning javelin runway, resurfacing is the appropriate action for the stadium.

This request is due to the condensed time line for the UST&F event that will be using the javelin runway surface on June 24th, 2019 as part of the Youth Championships.

Alignment with Strategic Plan: Goal 1-Community and Family Prosperity and Enrichment: Provide access to educational, vocational, economic and cultural opportunities. Empower citizens to select strategies that improve t...

Click here for full text