File #: 19-0240    Version: 1 Name:
Type: Action Item Status: Consent Agenda
File created: 5/6/2019 In control: Board of County Commissioners
On agenda: 6/10/2019 Final action:
Title: Execution of Consulting Services Agreement with SEDC Engineering, P.C. dba NV5 for the Fundamental LEED Commissioning Services for the Durham County Administration Building Renovation. Project No.: 4730DC137
Attachments: 1. Attachment 1, AAF Backup - NV5 Contract - Administration Building Renovations
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Item:                       

Title

Execution of Consulting Services Agreement with SEDC Engineering, P.C. dba NV5 for the Fundamental LEED Commissioning Services for the Durham County Administration Building Renovation.  Project No.: 4730DC137

 

Body

Date of BOCC Meeting:  June 10, 2019

 

Request for Board Action:

Agenda Text

The Board is hereby requested to authorize the County Manager to enter into a contract with SEDC Engineering, P.C. (SEDC) dba NV5 to provide Fundamental LEED Commissioning Services for the Durham County Administration Building Renovation located on 200 E. Main Street in the amount of $49,927.00 (See Attachment 1, Pages 1 - 19).

 

Based on the fact that the services are similar in scope to the Main Library Renovation, currently under construction, staff has elected to utilize NV5 for the Administration Building Renovation as well.  SEDC will verify that the project’s energy related systems are installed, calibrated and perform according to the owner’s project requirements, basis of design and construction documents.  Benefits of commissioning include reduced energy use, lower operating costs, reduced contractor callbacks, better building documentation, improved occupant productivity and verification that the systems perform in accordance with the owner’s project requirements. 

 

On October 27, 2008, the Durham County BOCC adopted the High Performance Building Policy for County projects. The Durham County High Performance Building Policy requires that new construction receive a “Gold” level LEED (Leadership in Energy and Environmental Design) Certification and that renovation projects receive a “Certified” level certification.  The proposal includes the necessary scope for the project to qualify for the LEED Energy & Atmosphere Prerequisite 1 for Fundamental Commissioning of Building Energy Systems. The project team is targeting a “Silver” level certification for this project. Funding for this service is available in the Administration Building Renovation Capital account.  For M/WBE Participation information (See Attachment 1, Page 19).

 

Alignment with Strategic Plan: This aligns with Goal 4 - Environmental Stewardship - through the improvement of the environmental performance of County buildings to reduce energy use and greenhouse gas emissions from the built environment. The renovation of this facility also addresses Goal 5 by providing more efficient service delivery and better customer service.

 

Resource Persons: Jay Gibson, P.E., General Manager/Director of Engineering and Environmental Services; Peri Manns, ASLA, LEED GA, Deputy Director of Engineering and Environmental Services; James Faress, P.E., Senior Project Manager

 

County Manager’s RecommendationThe County Manager recommends that the Board authorize the County Manager to enter into a contract with SEDC Engineering, P.C. (SEDC) dba NV5 to provide Fundamental LEED Commissioning Services for the Durham County Administration Building Renovation located on 200 E. Main Street in the amount of $49,927.00.

 

Signature

County Manager: ____________________________